Our technicians conducted GPS RTK Arc Testing on this project, identifying over 20 leaks and defects within the newly installed 1.5mm HDPE geomembrane. Following completion of the Arc Testing, an eDipole survey was conducted across the entire surface of the newly constructed landfill cell. This assessment identified additional leaks and areas of damage, primarily attributed to aggregate placement over the recently installed cushion geotextile layer. All defects were rectified in strict accordance with the approved technical specifications, after which the affected areas were re-tested to verify compliance with project requirements. The final inspection results confirmed the integrity of the installation and fully met client expectations.