Stage 7 interface lining at Elizabeth Drive Landfill, Kemps Creek NSW — geomembrane and geotextile installation with an Elis Tech technician arc testing the liner

Elizabeth Drive Landfill Stage 7 Interface Lining

Year
2026
Client
Cleanaway
Location
Kemps Creek, NSW
Size
8,000m²
Work Scope
RTK GPS Arc Testing

Elis Tech Australia is pleased to announce the successful completion of another RTK GPS Arc Testing project in NSW — the Stage 7 interface lining at Cleanaway’s Elizabeth Drive Landfill in Kemps Creek, covering 8,000m² of geomembrane.

The final deliverable included a detailed report overlaid on a georeferenced aerial image (provided by the client), clearly showing the testing boundaries, track logs and locations of identified leaks.

Final deliverable — testing boundaries, RTK GPS track logs and identified leak locations overlaid on the client-supplied georeferenced aerial image.

Our Leak Detection Technology provides our clients with confidence that the entire extent of the containment system has been thoroughly verified, ensuring the containment facility can be delivered free of leaks and in accordance with project requirements.