Elis Tech Australia is pleased to announce the successful completion of another RTK GPS Arc Testing project in NSW — the Stage 7 interface lining at Cleanaway’s Elizabeth Drive Landfill in Kemps Creek, covering 8,000m² of geomembrane.
The final deliverable included a detailed report overlaid on a georeferenced aerial image (provided by the client), clearly showing the testing boundaries, track logs and locations of identified leaks.

Our Leak Detection Technology provides our clients with confidence that the entire extent of the containment system has been thoroughly verified, ensuring the containment facility can be delivered free of leaks and in accordance with project requirements.