Mardie Salt and Potash Project

Primary Crystallisers

CLIENT : MRW Trading
CELL : C2F1 & C2F2
SIZE : 630,000m2

WORK SCOPE :

  1. Construction Quality Control (CQC)
  2. Survey of the Geotexlle layer
  3. Survey of the HDPE Installation
  4. As-constructed drawing preparation for both layers
  5. Complete CQA package preparation and submission

Elis Tech Australia deployed a 3-man crew on a rotating roster for this major large-scale project. Works comprised of accurate field data collection and precise RTK GPS surveying; all physical works were comprehensively documented and verified to produce accurate as-constructed As-Builts. The collected data was progressively compiled into complete and compliant CQC packages for each completed Lot, including master packages after the successful completion of a Cell.