
McArthur River Mine (Glencore) NOEF
Comprehensive leak location surveys were successfully completed in the Northern Territory on newly installed bituminous geomembranes and HDPE double-sided textured bi-modal geomembranes. The surveys employed

Comprehensive leak location surveys were successfully completed in the Northern Territory on newly installed bituminous geomembranes and HDPE double-sided textured bi-modal geomembranes. The surveys employed

Our technicians conducted GPS RTK Arc Testing on this project, identifying over 20 leaks and defects within the newly installed 1.5mm HDPE geomembrane. Following completion

Elis Tech Australia was engaged by Brisbane City Council (BCC) in collaboration with Teneo Group to conduct Arc Testing and Construction Quality Control (CQC) on