Elizabeth Drive Landfill Stage 7 Interface Lining

Stage 7 interface lining at Elizabeth Drive Landfill, Kemps Creek NSW — geomembrane and geotextile installation with an Elis Tech technician arc testing the liner

RTK GPS Arc Testing of the 8,000m² Stage 7 interface lining at Cleanaway’s Elizabeth Drive Landfill, Kemps Creek NSW — testing boundaries, track logs and leak locations delivered on a georeferenced aerial report.

Swanbank Cell 2 Stage 2

Elis Tech Australia vehicle overlooking the Swanbank Cell 2 Stage 2 landfill cell during geomembrane liner installation

RTK GPS Arc Testing of the newly constructed Cell 2 Stage 2 landfill cell at Swanbank, Brisbane QLD — 53,000m² of geomembrane liner progressively verified during installation.

McArthur River Mine (Glencore) NOEF

Arc Testing and eDipole leak location surveys of newly installed bituminous and HDPE geomembranes at the McArthur River Mine NOEF, Northern Territory.

Lismore Recycling And Recovery Centre

RTK GPS Arc Testing and a full eDipole survey of the new 1.5mm HDPE landfill cell liner at Lismore, NSW — over 20 defects located, repaired and re-tested to specification.

Brisbane Botanical Gardens

Arc Testing and CQC of the 1.5mm HDPE geomembrane for a boutique Brisbane City Council project, delivered with Teneo Group in the heart of Brisbane.